Pipe preparation
How to prepare PE pipe with a rotary scraper
Remove the oxidised surface evenly before electrofusion jointing.
Practical course support / Available anytime
Choose the work you are preparing for. The page will show the most relevant videos, notes and knowledge checks.
Showing all learning resources.
Selected learning path
Practical demonstrations
Pipe preparation
Remove the oxidised surface evenly before electrofusion jointing.
Pipe preparation
Use a drill-powered finger scraper to prepare house connection pipe.
Clamping
Secure and align a spigot fitting correctly during installation.
Installation
Tooling and installation steps for spigot saddle outlets larger than OD160.
Pressure testing
Set up a test using the egeplast quick-release Rothenberger pump.
Electrofusion
Clamp and install a FRIALEN electrofusion tapping saddle correctly.
Equipment
Set up and operate the Ritmo Elektra 500 electrofusion control unit.
Use the matching study notes and knowledge checks below, or view the related formal course.
Coming soon
Coming soon
Coming soon
20 questions
20 questions
15 questions
35 minutes
Interactive revision
Use the two existing 20-question quizzes to check your understanding. These revision checks do not replace formal assessment.
Tell us what is needed on site. We will route it to pipe, fittings, equipment, servicing or training.
PE pipe systems, fittings, welding equipment and certified training from Waterford.
© 2026 egeplast Ireland Ltd